The top photo shows the site as of September 25, 2026. The bottom photo shows the approximate outlines of the garage (in black) and buildings RB2.1 and 2.2. RB2.1 is in the foreground. The blue rectangles are approximate location of stairs or elevators. The flooded area in the foreground will also house the boiler and other equipment rooms as well as the base of the elevators and stairs. A second set of elevators on the right (west) side are not shown.,

September 25, 2026 - Showing excavation progress. and the base for the RB2.1 tower crane.

September 25, 2026 - Zoomed-out view of entire site with approximate location of the garage (black) and buildings.